PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Before pouring concrete at underground service pipes Facing South (800x600).jpg Building rebar columns for Elev. 1,2,3  (3rd Floor) Facing East (800x600).jpg Erecting the steel arch at Derrick -2 (2nd Floor) Facing North (800x600).jpg Erecting the steel arch at Derrick -2 (2nd Floor) Facing North-West (800x600).jpg Excavating for underground storm piping between column lines G-G.1 Facing South-East (800x600).jpg
Next page Before pouring concrete at underground service pipes Facing South (800x600)
Before pouring concrete at underground service pipes Facing South (800x600)